Neom water transmission system
The implementation of a pipeline length of 108 km , five tanks capacity of each tank 170000 m3 and pumping station capacity of 125000 m3 / day. In addtions, In addition, the infrastructure works for general site, which approximates one Million square meters.
Other Projects
40+ years’ experience
Storm Water & Flood Protection Measures
Implementation of concrete barriers, protections and channels to protect from the dangers of torrents for train stations
- DATE: JUNE 25, 2021
- Project Type: Dams
Maintenance and Cleanliness of Taif-Al-Baha roads
Operation, maintenance and cleanliness
- DATE: JUNE 25, 2021
- Project Type: Road Maintenance
Traffic safety equipment project
Traffic safety equipment equipment project, modification and improvement of surface intersections and dangerous areas on the road network of the branches of the Ministry of Transport in the regions (Mecca, Asir – Jizan – Najran – AlBaha)
- DATE: JUNE 25, 2021
- Project Type: Roads
Neom water transmission system
The implementation of a pipeline length of 108 km , five tanks capacity of each tank 170000 m3 and pumping station capacity of 125000 m3 / day. In addtions, In addition, the infrastructure works for general site, which approximates one Million square meters.
- DATE: JUNE 25, 2021
- Project Type: Water and Sewage Works
- TAGS: swcc
Through Out The Kingdom
Was established in 1977 in Riyadh, The Kingdom of Saudi Arabia as a Closed Joint Stock Company. In few years, the firm achieved remarkable recognition as one of the leading construction firms in the Kingdom of Saudi Arabia.
The Luxury Residence In Forest
Meh synth Schlitz, tempor duis single-origin coffee ea next level ethnic fingerstache fanny pack nostrud. Photo booth anim 8-bit hella, PBR 3 wolf moon beard Helvetica. Salvia
- Clients: Ethan Hunt
- Completion: February 5th, 2017
- Project Type: Villa, Residence
- Architects: Logan Cee
